Stand builder & contractor · Dubai

Exhibition stand builder
and contractor in Dubai.

DOT Exhibits designs and builds custom exhibition stands from its own workshop in Al Quoz, Dubai. We handle the design, approvals, production and on-site build with one team.

Mindware exhibition stand at GITEX Global in Dubai, built by DOT Exhibits

DOT Exhibits is an exhibition stand design and build company based in Al Quoz, Dubai. We have more than 10 years of experience and over 1,000 projects behind us, with production facilities in Dubai, Riyadh and Milan.

Dubai venues we build at

  • Dubai World Trade Centre (DWTC)
  • Dubai Exhibition Centre, Expo City Dubai

What we deliver

  • Design: concept, 3D visuals, materials and technical drawings
  • Approvals: organiser and venue submissions, structural calculations and contractor registration
  • Production: carpentry and joinery, painting, metal and glass work in our Dubai workshop
  • Graphics and signage: large-format printing, backlit graphics and wayfinding
  • AV and technology: LED walls, screens, touch displays and interactive demos
  • Furniture rental: meeting rooms, lounges and display counters
  • On site: build-up, a technician during the show, dismantling and storage

Dubai stands we have built

Plan around the deadlines

Each show sets its own stand design deadline, and a late submission at DWTC adds a penalty. Read our guide to the DWTC late fee, our 16-week planning timeline and what drives stand cost. Exhibiting at WHX? See our WHX Dubai 2027 page.

Frequently asked questions

Where is DOT Exhibits based?

Our headquarters and workshop are at Warehouse 3, 18a Street, Al Quoz Industrial Area 4, Dubai. We also have production facilities in Riyadh and Milan.

Which Dubai venues do you build at?

We build stands at Dubai World Trade Centre and at Dubai Exhibition Centre in Expo City Dubai.

What does a stand from DOT Exhibits include?

Design, 3D visuals and technical drawings, organiser approvals, in-house joinery, painting, graphics and signage, LED screens and AV, furniture rental, on-site build, show support and dismantling.

How early should I start planning?

Around 16 weeks before the show is a comfortable start. Each show sets its own design deadline, so check your exhibitor manual and work backwards from that date.

Is there a fee for submitting a stand design late at Dubai World Trade Centre?

Yes. DWTC charges a late penalty of AED 2,000 including VAT, on top of the normal stand review fee. Confirm the fees for your show in the exhibitor manual.

Exhibiting in Dubai? Send us your stand number and size on WhatsApp and we will reply with ideas and a budget range.

Let's build

Let's build your stand.

Warehouse 3, 18a Street, Al Quoz Industrial Area 4, Dubai, UAE